An engineering change order (ECO) is an instruction to make a change to one or more designs (for example, an instruction to change the backshells on connectors from straight to right-angle backshells). Once you make the change, you can set the ECO as completed.

You can manually create ECOs within the Capital design applications.

For detailed information about ECOs, see the Engineering Change Orders section in the Capital Design Tools - Common Functions User Guide.