CapitalKnowledge

Capital Harness Designer Modular > Module Code Assignation

Modules Ribbon Actions

This section details the various actions that are available under the Modules ribbon on the Automate tab.

Figure 419: Modules Ribbon

Note

The availability of these actions is governed by the Configuration Panel Options project preference setting.

  • Assign Functional Module Codes

  • Assign Production Module Codes

  • Copy FM Codes to PM Code Space

  • Generate Production Technical Variations

  • Simulate Production Technical Variations

  • Deleting Production Technical Variations

  • Clearing Module Codes

  • Purging Module Codes

  • Enable / Disable Design Override of Functional / Production Codes

  • Exporting Module Codes to Spreadsheet Applications

Parent Topic:

Module Code Assignation

Capital Harness Designer User Guide, 2512

Unpublished work. © 2025 Siemens

Source: https://docs.sw.siemens.com/en-US/doc/861057055/202410078.capital_hd_user/idc579f42f-1f2e-4d1f-8ca7-00cd91377b28 · retrieved 2026-07-18