Capital Harness Designer Modular > Functional and Production Module Code Maintenance
Adding a
Valid Selection to a Module Code Combination
You can add a valid selection row to the Valid Combinations table for a module code combination in the Module Code Dialog.
Procedure
Press Space Bar and enter Functional or Production Module Codes.If you are using Capital Project Manager, expand the Module Code Maintenance folder in the project tree and double-click the Functional or Production node. The Module Code Dialog Box is displayed.
Select the module code combination in the Module Code browser on the left of the dialog box.The Valid Combinations table on the right of the dialog box displays the existing valid selections for the module code combination.
Click to add a valid selection row to the table.
Specify a unique identifier for the valid selection in the Name column.
Select the module codes that are included in the valid selection.
Repeat steps 3 to 5 for each valid selection that you want to add.
Click OK.
Parent Topic:
Functional and Production Module Code Maintenance
Related Topics
Module Code Help
Creating a Functional or Production Folder at Project Level
Creating a Functional, Production or Technical Module Code at Project Level
Creating a Module Code Combination at Project Level
Deleting a Valid Selection from a Module Code Combination
Choose Module Code Dialog Box
Capital Harness Designer User Guide, 2512
Unpublished work. © 2025 Siemens
Source: https://docs.sw.siemens.com/en-US/doc/861057055/202410078.capital_hd_user/id683ad794-4362-4dc2-b8f0-0adbe83867d2 · retrieved 2026-07-18