Associating a Basic Plan
with a Design
You can edit the association of a basic plan with a Capital Systems Integrator design.
Note
Once you have associated a Pro Product Plan with a Capital Systems Integrator design, you can no longer associate a Basic Plan with that design.
Prerequisites
- The project containing the design must be open in the Project Browser Window.
Procedure
Right-click the design name and choose Edit.The Edit Design dialog box displays.
Choose one of the following procedures: If you want to...
Do the following:
Associate a plan
Click the ellipsis (...) button next to the Plan field; the Associate Existing Plan dialog box displays.
Select the plan and click OK; the plan name displays in the Plan field on the Edit Design dialog box.
Note If a design is open in the diagram window and has no plan associated yet, you can also right-click a plan in the Project Browser Window and choose Associate with Active Design.
Change the associated plan
Click the ellipsis (...) button next to the Plan field; the Associate Existing Plan dialog box displays.
Select the new plan and click OK; the new plan name displays in the Plan field on the Edit Design dialog box.
Remove the plan association
Click the Remove plan association () button; the Plan field is empty and the association is removed.
Results
When a design is open and active in the diagram window, the associated plan is indicated by a small circle in the Project Browser Window ().
Parent Topic:
Basic Plan
Related Topics
Creating a Basic Plan
Exporting and Importing a Basic Plan
Defining Models in a Basic Plan
Capital Systems Integrator User Guide, 2512.2606
Unpublished work. © 2026 Siemens
Source: https://docs.sw.siemens.com/en-US/doc/861057055/202511026.capital_si_user/id775c590c-5ba3-4a18-837b-13f97288945f · retrieved 2026-07-18