CapitalKnowledge

Bundle Configuration > Bundle Merging > Automatic Bundle Merging

Merge

Bundles and Insulation Runs if Dimension Exists at Optional Node Examples

You can use this project preference to influence how the composite or modular breakdown process merges bundles and insulation runs (where a dimension start or end point exists at a node that could potentially be removed) when run with the “Merge Bundles and Identical Insulation?” setting selected.

In this example, the project preference “Merge Bundles and Insulation Runs if Dimension Exists at Optional Node” is set to “Yes” as in Figure 73.

The example uses bundles, but the same principle applies to insulation runs.

Figure 73: Project Preference

The bundles in Figure 74 are candidates to be merged.

Figure 74: Potential Merge

Figure 75 shows the result of running composite or modular Breakdown with the preference set to Yes.

Figure 75: Preference Set to Yes

Figure 76 shows the result of running composite or modular Breakdown with the preference set to No.

Figure 76: Preference Set to No

Parent Topic:

Automatic Bundle Merging

Capital Harness Designer User Guide, 2512

Unpublished work. © 2025 Siemens

Source: https://docs.sw.siemens.com/en-US/doc/861057055/202410078.capital_hd_user/id89f786b4-23b1-4f06-8cf8-ae4a0a4cff83 · retrieved 2026-07-18