CapitalKnowledge

Harness Designs > Harness Synchronization

Simulating Harness Synchronization without Change Policies or

Build Lists

You can simulate a harness synchronization (without using change policies or build lists), to preview the effects of design changes from Capital Logic Designer or Capital Systems Integrator without the design changes being written to the Capital database.

Procedure

  1. Open the harness design so that it is displayed in the Diagram window.

  2. In the Project browser, right-click the required wiring design and select Synchronize.

  3. The Synchronize Harness Design dialog box is displayed.

  4. Click Simulate. The progress of the simulation is displayed. Once complete, click Close. Details of the changes that could have been made to the harness design are displayed in the Output Window.

Parent Topic:

Harness Synchronization

Related Topics

  • Considerations for Synchronizing Capital Systems Integrator or Topology Designs

  • Harness Synchronization

  • Synchronizing Without Change Policies or Build Lists

  • Synchronization Rules

Capital Harness Designer User Guide, 2512

Unpublished work. © 2025 Siemens

Source: https://docs.sw.siemens.com/en-US/doc/861057055/202410078.capital_hd_user/id1cf546b2-6a4e-4c09-8327-752028ee5ac3 · retrieved 2026-07-18