Engineering Change Orders
An engineering change order (ECO) is an instruction to make a change to one or more designs (for example, an instruction to change the backshells on connectors from straight to right-angle backshells). Once the change has been made, the ECO can be set as completed.
You can capture and store design changes against an ECO and re-apply them onto a different design revision at a later date.
See “Engineering Change Orders” in the Capital Design Tools - Common Functions User Guide.