Insulation > Bundle Insulation
Editing an Insulation Layer
There are multiple ways you can edit an insulation layer on a harness design.
Restrictions and Limitations
- If you make any changes to a layer that was initially added using an insulation Code, a message is displayed to warn you that the associated code will be removed.
Procedure
- Either:Right-click an insulation layer, either on the diagram or in the Harness Design Browser, and select Edit Insulation Layer Details.
Click within the Attributes field for the relevant layer in either the Edit Insulation Run Dialog Box or the Reorder/Edit Insulation Layers Dialog Box.
The Reorder/Edit Insulation Layers dialog box is displayed.
- Make any changes required to the insulation layer.Note You can manually override the calculated length of any tube by using the Override Tube Length settings on the Add or Edit Insulation Layer Dialog Box.
See also Quick Tubes.
- Click OK.
Parent Topic:
Bundle Insulation
Related Topics
Zooming Insulation
Edit Insulation Run Help
Reorder/Edit Insulation Layers Help
Reordering Insulation Layers
Setting the Path of an Insulation Run
Moving the End of an Insulation Run
Deleting an Insulation Run
Deleting an Insulation Layer
Add Insulation Layer Help
Adding an Insulation Run by Specifying Start and End Nodes
Adding an Insulation Run by Specifying Bundles
Usage Example - Drawing Insulation Line-styles in Capital Harness Designer
Capital Harness Designer User Guide, 2512
Unpublished work. © 2025 Siemens
Source: https://docs.sw.siemens.com/en-US/doc/861057055/202410078.capital_hd_user/id73e07012-948e-44c5-acdc-5657bc7ed942 · retrieved 2026-07-18