Engineering Change Orders
An engineering change order (ECO) is an instruction to make a change to one or more designs (for example, an instruction to change the backshells on connectors from straight to right-angle backshells). Once the change has been made, the ECO can be set as completed.
You can:
- Manually create ECOs within the Capital design applications.
See “Engineering Change Orders” in the Capital Design Tools - Common Functions User Guide.